We build the plant and the parts inside it.
Survey, engineering, fabrication, installation and commissioning under a single contract — with the balance of system built in our own workshop before it reaches your roof.
What happens, and what you receive
The same four stages run on every project, whether it is a 10 kWp hostel or a 400 kWp medical university. Only the scale changes.
| Stage | What we do | What you receive |
|---|---|---|
| 01Site Survey & Drawings | Our engineers survey the site and prepare all drawings and the electrical single-line diagram to match it. Every aspect of the site is studied before anything is ordered. |
|
| 02Design & Fabrication | The mounting system, protection unit, combiner box and the other parts the site needs are designed and manufactured at our own workshop, then the complete balance of system is transferred to site. |
|
| 03Structure & Module Installation | The module mounting structure and the modules themselves are installed as per the plan, built to suit the site’s aesthetics and conditions. |
|
| 04Electrical Installation | The PCU, AJB, ACDB, DCDB and remaining accessories are installed as per plan, and the plant is commissioned and handed over. |
|
Scroll the table sideways to see all three columns.
What “balance of system” means
Everything in a solar plant except the modules themselves — and all of it is made by us.
- Mounting systemThe galvanised structure the modules sit on
- Protection unitACDB, DCDB and fuse panels
- Combiner boxArray junction box with surge protection
- Power conditioningThe PCU that ties generation, storage and load
The balance of system, fabricated by us
Mounting Structures
Hot-dip galvanised above 100 micron, rated beyond 180 kmph wind.
View product
ACDB & DCDB
Distribution and fuse panels for plants from 1 kWp to 500 kWp.
View product
Array Junction Box
IP65 enclosures with HRC fuses, blocking diodes and surge protection.
View product
Power Conditioning Unit
Bidirectional inverters, 1–15 kVA, with in-house DSP MPPT control.
View productEngineering, procurement and construction
Our EPC team has experience and expertise in EPC services for more than four to five years.
The team studies every aspect of the site and installs it in the best possible way. We survey the site first and plan every part of the plant, then prepare the balance of system at our workshop to suit the site’s aesthetics and conditions — so the plant gives maximum output once installed.
The entire protection unit, mounting system and other accessories are designed and manufactured at our own factory by our engineering team. That is the difference between buying a plant and having one built: the equipment and the installation are matched to each other, because the same people are responsible for both.